This project was set to be the first large-scale mass timber office development east of greater Seattle. 5501 Lakeview is a two-story office building with two levels of underground parking and built using mass timber construction.
Hilltop Tacoma Link Extension (T100)
Matt Weir2023-01-20T15:48:03-08:00This project included constructing 2.4 miles of light rail transit (LRT) service, six new stations and one relocated station, and four traction power substation (TPSS) sites.
SR 167 – 70th Avenue East Bridge Replacement
Matt Weir2023-02-08T09:00:09-08:00This project consisted of a new four-lane bridge that doubles the capacity of the 70th Avenue E. Bridge over I-5, a new 12-foot shared-use path on the bridge, widening of both directions of SR 99, and construction of a new roundabout; all to reduce congestion and improve safety on the arterials and intersections.
Stratolaunch Carrier Aircraft Fabrication Building, Hangar, and Office
Matt Weir2023-01-20T15:49:02-08:00The project included the construction of the new hangar at Mojave Air & Space Port. The fabrication building is an 88,000 sf facility completely air conditioned with an energy efficient Daikin System.
Main Street Revitalization Phase 1
Matt Weir2023-01-20T15:49:27-08:00The Main Street project called for the re-construction of key roadway and utility infrastructure in the Town Center area of Mountlake Terrace.
Runway 11/29 Rehabilitation Project
Matt Weir2023-01-20T15:49:41-08:00Arlington Municipal Airport covers an area of 1,189 acres which contains two asphalt paved runways: 16/34 and 11/29. This project included the rehabilitation of the existing 11/29 runway.
Holden San Jose I & San Jose Bascom II
Matt Weir2023-01-20T15:50:00-08:00Holden of San Jose I is a 4-story, 200 unit assisted living facility with 107 underground parking spaces. This facility is unique in that its construction type is non-combustible allowing for all floors to be fully accessible to non-ambulatory residents.
Revel Lacey Senior Living
Matt Weir2023-01-20T15:50:16-08:00Revel Lacey is a 135-unit, independent living community in Lacey, Washington for residents aged 55 and over. The garden-style development is located just off of Martin Way in Lacey, WA.
Clovis Community Medical Center
Matt Weir2023-01-20T15:50:32-08:00The three-story center was approximately a $65M dollar project and about 100,000 square feet. The facility was the first of its kind in the San Joaquin Valley and is located on the Clovis Community campus, adjacent to Highway 168. It took 16 months to build.
Community Regional Medical Center
Matt Weir2023-01-20T15:51:16-08:00This project included the construction of the new 5-story medical office building for Community Regional Medical Center. This expansion for Community Regional Medical Center was built from the dirt up. Its purpose as to respond to the growth in the community and provide excellent care for the people in the community.