This project demolishes the existing bridge over the Puyallup River and Builds a new bridge with on HOV land and four general purpose lanes dedicated to the southbound traffic.
Hilltop Tacoma Link Extension (T100)
Matt Weir2023-01-20T15:48:03-08:00This project included constructing 2.4 miles of light rail transit (LRT) service, six new stations and one relocated station, and four traction power substation (TPSS) sites.
SR 167 – 70th Avenue East Bridge Replacement
Matt Weir2023-02-08T09:00:09-08:00This project consisted of a new four-lane bridge that doubles the capacity of the 70th Avenue E. Bridge over I-5, a new 12-foot shared-use path on the bridge, widening of both directions of SR 99, and construction of a new roundabout; all to reduce congestion and improve safety on the arterials and intersections.
Stratolaunch Carrier Aircraft Fabrication Building, Hangar, and Office
Matt Weir2023-01-20T15:49:02-08:00The project included the construction of the new hangar at Mojave Air & Space Port. The fabrication building is an 88,000 sf facility completely air conditioned with an energy efficient Daikin System.
Main Street Revitalization Phase 1
Matt Weir2023-01-20T15:49:27-08:00The Main Street project called for the re-construction of key roadway and utility infrastructure in the Town Center area of Mountlake Terrace.
Runway 11/29 Rehabilitation Project
Matt Weir2023-01-20T15:49:41-08:00Arlington Municipal Airport covers an area of 1,189 acres which contains two asphalt paved runways: 16/34 and 11/29. This project included the rehabilitation of the existing 11/29 runway.
UW Medicine | Valley Medical Center North Parking Garage Expansion
Matt Weir2023-01-27T13:51:26-08:00The project is a new seven-story 381,300 square foot expansion to an existing parking structure on the Valley Medical Center Campus. The project is phased construction, with early owner occupancy of level 3 required. The estimated cost is $25 - $28 million.
Tacoma Trestle Track & Signal Project
Matt Weir2023-01-27T13:52:47-08:00This project is a collaboration between multiple entities: Sound Transit, WSDOT, and the City of Tacoma. This is a federally funded replacement of 0.65 miles of track between the Tacoma Dome Station and East M Street.
Boonville Airport
Matt Weir2023-01-27T13:55:17-08:00Project Title: Boonville Airport Location: Boonville, CA Services: Pavement Design & Rehabilitation Description: Krazan provided Quality Control/Quality Assurance testing for the reconstruction of runways and taxiways at the Booneville, California Airport to include lime stabilization of the subgrade, testing of the aggregate base course and testing of the asphalt pavement. Krazan’s on-site team performed [...]