The project consisted of a new seafood restaurant and the first-ever beer and wine garden at any US airport. The Salty’s brand is a PNW favorite for seasonal seafood and regional wines, plus incredible brunch experiences.
Good Shepherd Supportive Housing
Matt Weir2023-11-05T22:31:39-08:00This project consists of a new seven-story permanent supportive housing building that is approximately 47,900 square feet in size. The new building will contain 92 residential units for both low-wage workers and for individuals experiencing homelessness.
Timber Ridge Animal Clinic
Matt Weir2023-11-05T22:17:08-08:00The project consisted of new construction for a veterinary clinic including exam rooms, office space, waiting foyer, kennel and other associated spaces. Site improvements included new parking lot and trash enclosure.
Downing Elementary School Replacement
Matt Weir2023-02-08T09:18:45-08:00Voters approved the 2020 bond measure to replace or renovate eight aging neighborhood schools. Downing Elementary is one of the projects covered under this bond measure.
I-5 Portland Avenue to Port of Tacoma Road – Southbound HOV
Matt Weir2023-02-08T08:58:38-08:00This project demolishes the existing bridge over the Puyallup River and Builds a new bridge with on HOV land and four general purpose lanes dedicated to the southbound traffic.
West Sammamish River Bridge
Matt Weir2023-01-20T15:27:32-08:00This project replaces the existing southbound bridge across the Sammamish River and includes the construction of new sidewalk and bike facilities on the west side of the road between NE 170th St and NE 175th St.
5501 Lakeview Building
Matt Weir2023-01-20T15:45:58-08:00This project was set to be the first large-scale mass timber office development east of greater Seattle. 5501 Lakeview is a two-story office building with two levels of underground parking and built using mass timber construction.
Hilltop Tacoma Link Extension (T100)
Matt Weir2023-01-20T15:48:03-08:00This project included constructing 2.4 miles of light rail transit (LRT) service, six new stations and one relocated station, and four traction power substation (TPSS) sites.
SR 167 – 70th Avenue East Bridge Replacement
Matt Weir2023-02-08T09:00:09-08:00This project consisted of a new four-lane bridge that doubles the capacity of the 70th Avenue E. Bridge over I-5, a new 12-foot shared-use path on the bridge, widening of both directions of SR 99, and construction of a new roundabout; all to reduce congestion and improve safety on the arterials and intersections.
Stratolaunch Carrier Aircraft Fabrication Building, Hangar, and Office
Matt Weir2023-01-20T15:49:02-08:00The project included the construction of the new hangar at Mojave Air & Space Port. The fabrication building is an 88,000 sf facility completely air conditioned with an energy efficient Daikin System.