This project demolishes the existing bridge over the Puyallup River and Builds a new bridge with on HOV land and four general purpose lanes dedicated to the southbound traffic.
West Sammamish River Bridge
Matt Weir2023-01-20T15:27:32-08:00This project replaces the existing southbound bridge across the Sammamish River and includes the construction of new sidewalk and bike facilities on the west side of the road between NE 170th St and NE 175th St.
Hilltop Tacoma Link Extension (T100)
Matt Weir2023-01-20T15:48:03-08:00This project included constructing 2.4 miles of light rail transit (LRT) service, six new stations and one relocated station, and four traction power substation (TPSS) sites.
SR 167 – 70th Avenue East Bridge Replacement
Matt Weir2023-02-08T09:00:09-08:00This project consisted of a new four-lane bridge that doubles the capacity of the 70th Avenue E. Bridge over I-5, a new 12-foot shared-use path on the bridge, widening of both directions of SR 99, and construction of a new roundabout; all to reduce congestion and improve safety on the arterials and intersections.
Main Street Revitalization Phase 1
Matt Weir2023-01-20T15:49:27-08:00The Main Street project called for the re-construction of key roadway and utility infrastructure in the Town Center area of Mountlake Terrace.
Runway 11/29 Rehabilitation Project
Matt Weir2023-01-20T15:49:41-08:00Arlington Municipal Airport covers an area of 1,189 acres which contains two asphalt paved runways: 16/34 and 11/29. This project included the rehabilitation of the existing 11/29 runway.
Fresno Plan to End Homelessness
Matt Weir2023-01-27T13:44:08-08:00The City of Fresno has been working towards a strategy to end homelessness. Krazan successfully provided environmental clearance to local partners for property purchase and HUD funding to house nearly 50 percent of the City of Fresno’s unsheltered population.
Point Defiance Zoo and Aquarium – Rocky Shores Sea Lion Exhibit
Matt Weir2023-01-27T13:50:48-08:00The Sea Lion Exhibit was built in 1963 and was showing signs of corrosion. Improvements included a two-level aquarium redesigned home for the California sea lions and harbor seals [...]
Tacoma Trestle Track & Signal Project
Matt Weir2023-01-27T13:52:47-08:00This project is a collaboration between multiple entities: Sound Transit, WSDOT, and the City of Tacoma. This is a federally funded replacement of 0.65 miles of track between the Tacoma Dome Station and East M Street.
Ballard Siphon
Matt Weir2023-01-27T13:53:23-08:00Project Title: Ballard Siphon Location: Seattle, WA Services: Material Testing and Inspections Description: Krazan provided testing and inspection services for the construction of this project which included but are not limited to: Soil compaction testing, shotcrete, reinforced concrete, proprietary anchor, and structural steel inspections. This project includes a new 2,000 linear foot, 85-inch diameter siphon [...]