Formerly known as FX McRorys Building, this is one of three early 20th century buildings being updated as part of the Railspur redevelopment. This includes an alley re-activation and a new retail district in historic Pioneer Square.
I-5 Portland Avenue to Port of Tacoma Road – Southbound HOV
Matt Weir2023-02-08T08:58:38-08:00This project demolishes the existing bridge over the Puyallup River and Builds a new bridge with on HOV land and four general purpose lanes dedicated to the southbound traffic.
5501 Lakeview Building
Matt Weir2023-01-20T15:45:58-08:00This project was set to be the first large-scale mass timber office development east of greater Seattle. 5501 Lakeview is a two-story office building with two levels of underground parking and built using mass timber construction.
Hilltop Tacoma Link Extension (T100)
Matt Weir2023-01-20T15:48:03-08:00This project included constructing 2.4 miles of light rail transit (LRT) service, six new stations and one relocated station, and four traction power substation (TPSS) sites.
SR 167 – 70th Avenue East Bridge Replacement
Matt Weir2023-02-08T09:00:09-08:00This project consisted of a new four-lane bridge that doubles the capacity of the 70th Avenue E. Bridge over I-5, a new 12-foot shared-use path on the bridge, widening of both directions of SR 99, and construction of a new roundabout; all to reduce congestion and improve safety on the arterials and intersections.
Stratolaunch Carrier Aircraft Fabrication Building, Hangar, and Office
Matt Weir2023-01-20T15:49:02-08:00The project included the construction of the new hangar at Mojave Air & Space Port. The fabrication building is an 88,000 sf facility completely air conditioned with an energy efficient Daikin System.
Main Street Revitalization Phase 1
Matt Weir2023-01-20T15:49:27-08:00The Main Street project called for the re-construction of key roadway and utility infrastructure in the Town Center area of Mountlake Terrace.
Runway 11/29 Rehabilitation Project
Matt Weir2023-01-20T15:49:41-08:00Arlington Municipal Airport covers an area of 1,189 acres which contains two asphalt paved runways: 16/34 and 11/29. This project included the rehabilitation of the existing 11/29 runway.
Holden San Jose I & San Jose Bascom II
Matt Weir2023-01-20T15:50:00-08:00Holden of San Jose I is a 4-story, 200 unit assisted living facility with 107 underground parking spaces. This facility is unique in that its construction type is non-combustible allowing for all floors to be fully accessible to non-ambulatory residents.
Revel Lacey Senior Living
Matt Weir2023-01-20T15:50:16-08:00Revel Lacey is a 135-unit, independent living community in Lacey, Washington for residents aged 55 and over. The garden-style development is located just off of Martin Way in Lacey, WA.