Transportation
When examined, the transportation system sector has seven key subsectors (or modes). Krazan has actively worked in six of those seven; aviation, highway and motor; maritime; mass transit and passenger rail; pipeline systems; freight rail; and postal and shipping.
Depending on which subsector you look at, all are growing and changing strategies to align with the future needs of consumers. How do we leverage technology and connectivity to alter the way roads are used and managed? Where will the future mobility hubs be built to deliver a streamlined and efficient travel experience? Krazan doesn’t have the answers to these questions but we do think about these questions from a customers’ experience point of view…and…how will we assist in the future of transportation. The following are a few examples of our contribution to the future of transportation.
Examples Include:
I-5 Portland Avenue to Port of Tacoma Road – Southbound HOV
This project demolishes the existing bridge over the Puyallup River and Builds a new bridge with on HOV land and four general purpose lanes dedicated to the southbound traffic.
Hilltop Tacoma Link Extension (T100)
This project included constructing 2.4 miles of light rail transit (LRT) service, six new stations and one relocated station, and four traction power substation (TPSS) sites.
SR 167 – 70th Avenue East Bridge Replacement
This project consisted of a new four-lane bridge that doubles the capacity of the 70th Avenue E. Bridge over I-5, a new 12-foot shared-use path on the bridge, widening of both directions of SR 99, and construction of a new roundabout; all to reduce congestion and improve safety on the arterials and intersections.
Stratolaunch Carrier Aircraft Fabrication Building, Hangar, and Office
The project included the construction of the new hangar at Mojave Air & Space Port. The fabrication building is an 88,000 sf facility completely air conditioned with an energy efficient Daikin System.
Main Street Revitalization Phase 1
The Main Street project called for the re-construction of key roadway and utility infrastructure in the Town Center area of Mountlake Terrace.
Runway 11/29 Rehabilitation Project
Arlington Municipal Airport covers an area of 1,189 acres which contains two asphalt paved runways: 16/34 and 11/29. This project included the rehabilitation of the existing 11/29 runway.
UW Medicine | Valley Medical Center North Parking Garage Expansion
The project is a new seven-story 381,300 square foot expansion to an existing parking structure on the Valley Medical Center Campus. The project is phased construction, with early owner occupancy of level 3 required. The estimated cost is $25 - $28 million.
Tacoma Trestle Track & Signal Project
This project is a collaboration between multiple entities: Sound Transit, WSDOT, and the City of Tacoma. This is a federally funded replacement of 0.65 miles of track between the Tacoma Dome Station and East M Street.
Boonville Airport
Project Title: Boonville Airport Location: Boonville, CA Services:Â Pavement Design & Rehabilitation Description: Krazan provided Quality Control/Quality Assurance testing for the reconstruction of runways and taxiways at the Booneville, California Airport to include lime [...]